中文版 English      
 
   Search engine
Title Text
   New projects
Salvage Project of Helios 3 Wreck
Bid Section I of the Waterway Maintenance Project (Phase 2) for the Puyang River from the Yaogongbu Bridge to Xintingbu, Zhuji City
Relocation Project of Bid Section 1 of the Port for Traffic between Land and Island at Aojiang, Pingyang County
The Wharf at the South Bank and Part of the Revetment Works of Gaoting Central Fishing Harbor at Daishan County
Reinforcement and Modification Project of Guoju Qidu Port
The Shijing Fishery Quay Extension Project for Taiwan use only at Nan’an City
Technical Reforming Project at the Gangzhangwan Passenger Dock at Ningde (water engineering part)
Daqu Grade 1 Fishing Harbor Construction Project at Daishan County
Zhoushan Base Port Project
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D41-D42
Dredging Project of Yangtze Estuary Deepwater Channel Improvement Phase III Wreck Removal Project near Light Buoy D29
Emergency handling of Daixiang No. 1
Salvage of Taiwanese Wreck
Salvage of Wrecks during Typhoon Period
Salvage of Wreck Ruijiang No. 6
Early Phase Project of Jintang Dapukou Container Dock
Land Formation Project of Zhuangyuan’ao Container Dock in Wenzhou
Cast-in-situ Bored Pile Installation of Aoshan Transfer Base Oil Storage Tank Foundation in Zhoushan under CNPC (China National Petroleum Corporation)
Improvement Project along the East Sea area in Xiamen
Sediment Dredging, Riprap and Accropode Placement Project of Deep Water Channel Improvement Phase III at the Yangtze River Estuary
Improvement Project of a Smelly Black River Channel of Zhangjialu Port in Zhuqiao Town
Xinliuhe Beach Nourishment and Installation of Accropodes of the Submerged Breakwater at Nanshatou Passage
Breakwater Project in the Western Area of Yangshan Deep Water Port
Land Formation Project (Phase I) of Utility Area and Comprehensive Energy Utilization Area of Xiaoyangshan Port
Qingcaosha Reservoir and Water Intake & Transfer Pump Brake Project
East Breakwater and Land Formation Project of Beilun Container Dock Phase IV in Ningbo Port
Breakwater Project of Merchants International Daxie Terminals
Mud Blowing Project of the Pilot Area of Wenzhou High-Tech Industrial Base for Private Economy
Construction Contract Section II of Reclamation in the Southern Part of Leqingwan Port Phase I
Hydraulic Filling Project of Diaolang Reclamation Area in Zhoushan City
Dredging Project of Yangshan Deep Water Port Phase I
2 × 50,000-ton-class General Berth Extension Project of Longkou Port in Shandong Province
100,000-ton-class Channel Project of Longkou Port in Shandong Province
Dredging and Maintenance Project of Beisha Port (from Jianchuan Road Bridge to Estuary of the Huangpu River) under Shanghai Municipality On The Administration Of Waterway Transportation
Dock Dredging (bid section 1) and Waterfront Construction for Yangshan Oil Storage Project
300,000-ton-class Crude Oil Dock Dredging Project of Cezi Isle Oil Depot of Nanjing Oil Transportation Department
Shenjiamen Port Dredging Project (bid section II) of Putuo District, Zhoushan City
Dredging and Maintenance Project (bid section II) of the Yunzaobang Channel (Baoshan Section)
Channel Improvement Project of Shunde Waterway and Ganzhu Waterway in Guangdong Province
Coal Dock Dredging Project of Ningbo Beilun Power Plant
Renovation & Extension Project of Upstream Mooring Dolphins of Huai’an No.1 Ship Lock
Water Engineering Project of Ningbo Maritime Supervision Base under Zhejiang Maritime Safety Administration
Water Engineering Project of Zhoushan Maritime Supervision Base under Zhejiang Maritime Safety Administration
Phase I Project of Dongdian Level-2 Fishing Port at Jinshang Town, Shishi City, Fujian Province
3,000-ton-class Berth Extension Project of Zhoushan COFCO
Outfitting Dock Construction Phase 1 and Approach Bridge Project of Funing Shipbuilding Co., Ltd. in Fujian Province
No.2 Outfitting Dock Project Phase II of Tsuneishi Group (ZHOUSHAN) Shipbuilding Inc. (TZS)
Precast Yard Dock Project of CCCC Third Harbor Engineering Co., Ltd.


Making friends through every single project
     DARUN honour(quality)
   Human resources
 
 
 
   A subsidiary of Dynamic 
Friendly link
Ministry of Transport of the People's Republic of China
Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)
Water Transport Construction Industry Association
China Dredging Association
Maritime Safety Administration People's Republic of China
Shanghai Maritime Safety Administration
Zhejiang Maritime Safety Administration
Shandong Maritime Safety Administration
 
 
 
大衢渔港第一阶段施工完成
   
 

    目前,大衢一级渔港项目护岸工程已经施工到0+150m桩号位,内外侧水下爆破均已完成。根据施工组织设计,当护岸工程施工到150m时,要进行钻孔检测,以确定施工质量,因此,这标志着护岸工程第一阶段已完成。

    在这150m段护岸施工的过程中,项目部严格控制施工质量和施工进度,特别是对于一些重要参数,如堤头爆前抛高为4.5~5m,爆后补抛高程为3m,循环进尺6m,爆后堤身宽度为14m,每炮炸药量为288kg等,坚决按照设计执行,绝不含糊。对于安全问题,项目部领导更是给予了高度的重视。安全员刘明贤每天都会守在工地现场,对各种细小安全隐患进行排除,刘圣汉经理对现场的复杂情况进行指挥,把一切安全隐患杜绝,真正做到安全施工。

    第一阶段护岸工程的施工经验十分重要,因为它是一个标杆,直接关系到日后的护岸工程质量。通过这一阶段的施工,项目部总结经验,争取今后的工作更加仔细,早日保质保量的完成施工任务。(大衢项目部 尹卓)

   
Date〖2010-08-26〗    Read〖1984〗
 
Sent to friends Sent to friends   Print Preview Print Preview   Go Top Go Top
 
 
 
 
 


 
 
COPYRIGHT©2008  Shanghai Darun Port Construction Group Co.,Ltd    Add:16th floor Jinqiao Buiding, No.1389 Jinqiao Road,Shanghai    Tel:021-58777100
Shanghai Darun Port Construction Group Co.,Ltd    copyright 2008 By Darun.    Statistic: 

工信部备案号:沪ICP备13045817号-1    沪公网安备 31011502002599号