【Project Overview】 This dredging project (bid section II) extended from Banshengdong in the east to Dayganpu in the west. Shanghai Darun Port Construction Group Co., Ltd. undertook the 10km channel dredging project, consisting of a total dredging quantity of 3 million m3, with a total investment of over RMB 20 million.The dredged channel at the port was 6m deep; the sub-channels at both sides were 5m deep; and the beach was 3m deep at the north shore. The navigation channel was remarkably improved after dredging .
|